Zhejiang Hongcheng Building Materials Co., Ltd.
Main products:Asphalt Shingles,Culture Stone,Water Proofing Membrane,Wall Tile,3-Tab Asphalt Shingles
Products
Contact Us
  • Contact Person : Ms. Zheng shirley
  • Company Name : Zhejiang Hongcheng Building Materials Co., Ltd.
  • Tel : 0086-570-3851791
  • Fax : 0086-570-3851158
  • Address : Zhejiang,Quzhou,No.401,Sanqu Road
  • Country/Region : China
  • Zip : 324000

bitumen roofing felt

bitumen roofing felt
Product Detailed
Bituminous roofing membranes represent a major portion of today's roofing and have a strong record of reliability. The waterproo
 

Construction Points]

Construction methods——hot melt, cold and hot adhering methods could be adopted to adhere sheets and substrates, or different sheets. While constructed with hot melt method, the thickness of membrane must be over 3mm; if constructed with cold adhering method, the thickness of cold adhesive must be 0.5~1mm.Substrate preparation——waterproofing substrates shall be flat, solid, and be dried sufficiently. Detail structures shall meet requirements of related stipulations and designs. Waterproofing layer——there are two kinds of structures of laminated and single layers, for laminated layers, thickness of each layer shall be not lower than 3mm, with complete adhesion between each other; for single layer, thickness of the single layer shall not be lower than 4mm. ·Overlapping——overlapping between sheets shall be completely adhered, with 80-100mm width of jointed area.·Vertical surface ends——fasten with metal battens and bolts, coat special sealant in all edges. Protection isolation layer construction——protection isolation layer shall be set on the exterior surface of waterproof layers according to related stipulations and designs, if use shale sheets or mineral grain coating surfaces as exposed waterproof layers, additional protective layer could be omitted; isolation layers shall be set between waterproof layers and rigid protective layers.  [Attentions for Construction]·Construction shall not be carried out in rain, snow or over 5 degree wind weather; ·There shall be sufficient safety protective facilities in construction site, place firefighting devices according to stipulations. Installation Sketch point Clean the substrate using broom or high pressure dusty cleaner. Apply primer  Heat the membrane bottom using a high temperature flame gun. Push forward while the primer and membrane oil melted Use a roller to push hard the membrane surface to ensure it stick firmly 

Technical data Confirming to GB18242-2008

No.ItemIII
PYGPYGPYG
1Soluble content/(g/m2)≥3mm2100 
4mm2900 
5mm3500
Test No flame No flame 
2Heat resistance°C90105
≤mm2
TestNo flow, no dripping
3Low temperature flexibility/°C-20-25
No crack
4Impermeability 30minutes0.3MPa0.2MPa0.3MPa
5TensionMaximum/(N/50mm)500350800500900
Secondly-Maximum    800
TestNo crack, no apart
6ElongationMaximum/%≥30 40  
Secondly-Maximum≥  15
7Oil LeakingPieces≤2

bitumen roofing felt



Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.